S7 Meas - Measurement of the installed fibre optic sensor cables at construction lot 08 Tunnel

Project: Research project

Project Details

Description

Fiber optic measurement inside shotcrete tunnel linings at Tunnel Rudersdorf.
StatusActive
Effective start/end date1/07/2031/07/21