Project Details
Description
To evaluate the chemical condition of the building substance of the Annaberg railway tunnel (municipiality St. Michael in Upper Styria) on behalf of drill cores and several hand-collected solid samples (preliminarily planned 12) are to be performed as well as hydrochemical characterisation of several liquid samples (preliminarily planned 6). The results will be prepared within the scope of a written report and presentations at the customer.
Status | Finished |
---|---|
Effective start/end date | 16/10/20 → 15/03/21 |