Optimization of the Round Length in Design Stage for Tunnel Excavation in Weak Rock

Young-Zoo Lee, Wulf Schubert, Chang-Yong Kim

Research output: Chapter in Book/Report/Conference proceedingConference contributionResearchpeer-review

Original languageEnglish
Title of host publicationRock Mechanics in Underground Construction, Proceedings ISRM International Symposium 2006, 4th Asian Rock Mechanics Symposium, 8-10 November 2006, Singapore
PublisherWorld Scientific
Pages118-118
Publication statusPublished - 2006
EventISRM International Symposium - Singapur, Singapore
Duration: 8 Nov 200610 Nov 2006

Conference

ConferenceISRM International Symposium
CountrySingapore
CitySingapur
Period8/11/0610/11/06

Cite this

Lee, Y-Z., Schubert, W., & Kim, C-Y. (2006). Optimization of the Round Length in Design Stage for Tunnel Excavation in Weak Rock. In Rock Mechanics in Underground Construction, Proceedings ISRM International Symposium 2006, 4th Asian Rock Mechanics Symposium, 8-10 November 2006, Singapore (pp. 118-118). World Scientific.