Impact of the beam pipe design on the operation parameters of the superconducting magnets for the SIS 100 synchrotron of the FAIR project.

Fischer Ekbert, Pierre Schnizer, Christoph Heil, Anna Mierau, Bernhard Schnizer, Seong Y. Shim

Research output: Contribution to journalArticlepeer-review

Original languageEnglish
Pages (from-to)032012-032034
JournalJournal of Physics: Conference Series
Volume234
DOIs
Publication statusPublished - 2010

Fields of Expertise

  • Sonstiges

Treatment code (Nähere Zuordnung)

  • Application
  • Theoretical
  • Experimental

Cite this