Original language | English |
---|---|
Title of host publication | 2018 IEEE Energy Conversion Congress and Exposition (ECCE) |
Pages | 7363-7368 |
DOIs | |
Publication status | Published - 6 Dec 2018 |
Event | 2018 IEEE Energy Conversion Congress and Exposition - Portland, United States Duration: 23 Sep 2018 → 27 Sep 2018 |
Conference
Conference | 2018 IEEE Energy Conversion Congress and Exposition |
---|---|
Abbreviated title | ECCE 2018 |
Country | United States |
City | Portland |
Period | 23/09/18 → 27/09/18 |
Fields of Expertise
- Sustainable Systems
Cite this
Holzer, T., & Muetze, A. (2018). Full-Size Converter Operation of Large Hydro Power Generators: Generator Design Aspects. In 2018 IEEE Energy Conversion Congress and Exposition (ECCE) (pp. 7363-7368) https://doi.org/10.1109/ECCE.2018.8558197
Full-Size Converter Operation of Large Hydro Power Generators: Generator Design Aspects. / Holzer, Thomas; Muetze, Annette.
2018 IEEE Energy Conversion Congress and Exposition (ECCE). 2018. p. 7363-7368.Research output: Chapter in Book/Report/Conference proceeding › Conference contribution › Research
Holzer, T & Muetze, A 2018, Full-Size Converter Operation of Large Hydro Power Generators: Generator Design Aspects. in 2018 IEEE Energy Conversion Congress and Exposition (ECCE). pp. 7363-7368, 2018 IEEE Energy Conversion Congress and Exposition , Portland, United States, 23/09/18. https://doi.org/10.1109/ECCE.2018.8558197
Holzer T, Muetze A. Full-Size Converter Operation of Large Hydro Power Generators: Generator Design Aspects. In 2018 IEEE Energy Conversion Congress and Exposition (ECCE). 2018. p. 7363-7368 https://doi.org/10.1109/ECCE.2018.8558197
@inproceedings{a8125c1e985e46d28ffaaff3c2fbedd7,
title = "Full-Size Converter Operation of Large Hydro Power Generators: Generator Design Aspects",
author = "Thomas Holzer and Annette Muetze",
year = "2018",
month = "12",
day = "6",
doi = "10.1109/ECCE.2018.8558197",
language = "English",
pages = "7363--7368",
booktitle = "2018 IEEE Energy Conversion Congress and Exposition (ECCE)",
}
TY - GEN
T1 - Full-Size Converter Operation of Large Hydro Power Generators: Generator Design Aspects
AU - Holzer, Thomas
AU - Muetze, Annette
PY - 2018/12/6
Y1 - 2018/12/6
U2 - 10.1109/ECCE.2018.8558197
DO - 10.1109/ECCE.2018.8558197
M3 - Conference contribution
SP - 7363
EP - 7368
BT - 2018 IEEE Energy Conversion Congress and Exposition (ECCE)
ER -