Errichtung eines Eisenbahntunnels in Deckelbauweise über dem Hauptsammler West der Stadt Stuttgart

Translated title of the contribution: Construction of a railway tunnel above the main drainage tunnel of Stuttgart using the cut-and-cover method

Andreas-Nizar Granitzer*, Franz Tschuchnigg, Wolfgang Summerer, Robert Galler, Thomas Stoxreiter

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

Fingerprint

Dive into the research topics of 'Construction of a railway tunnel above the main drainage tunnel of Stuttgart using the cut-and-cover method'. Together they form a unique fingerprint.

Engineering

Earth and Planetary Sciences