CONSTRUCTION MANAGEMENT IN MULTI-STOREY TIMBER HOUSING – PARAMETER ANALYSIS OF COSTS, WORK PREPARATION AND EQUIPMENT TECHNOLOGY WITHIN PREFABIRICATED CLT WALL-ELEMENTS

Research output: Contribution to conferenceAbstractResearchpeer-review

Original languageGerman
Publication statusSubmitted - 31 Aug 2017
EventWCTE 2018 - World Conference on Timber Engineering 2018 - Seoul, Korea, Republic of
Duration: 20 Aug 201823 Aug 2018

Conference

ConferenceWCTE 2018 - World Conference on Timber Engineering 2018
CountryKorea, Republic of
CitySeoul
Period20/08/1823/08/18

Cite this

CONSTRUCTION MANAGEMENT IN MULTI-STOREY TIMBER HOUSING – PARAMETER ANALYSIS OF COSTS, WORK PREPARATION AND EQUIPMENT TECHNOLOGY WITHIN PREFABIRICATED CLT WALL-ELEMENTS. / Koppelhuber, Jörg; Huter, Philipp; Heck, Detlef.

2017. Abstract from WCTE 2018 - World Conference on Timber Engineering 2018, Seoul, Korea, Republic of.

Research output: Contribution to conferenceAbstractResearchpeer-review

@conference{607948124e824164859a6c22257954c7,
title = "CONSTRUCTION MANAGEMENT IN MULTI-STOREY TIMBER HOUSING – PARAMETER ANALYSIS OF COSTS, WORK PREPARATION AND EQUIPMENT TECHNOLOGY WITHIN PREFABIRICATED CLT WALL-ELEMENTS",
author = "J{\"o}rg Koppelhuber and Philipp Huter and Detlef Heck",
year = "2017",
month = "8",
day = "31",
language = "deutsch",
note = "WCTE 2018 - World Conference on Timber Engineering 2018 ; Conference date: 20-08-2018 Through 23-08-2018",

}

TY - CONF

T1 - CONSTRUCTION MANAGEMENT IN MULTI-STOREY TIMBER HOUSING – PARAMETER ANALYSIS OF COSTS, WORK PREPARATION AND EQUIPMENT TECHNOLOGY WITHIN PREFABIRICATED CLT WALL-ELEMENTS

AU - Koppelhuber, Jörg

AU - Huter, Philipp

AU - Heck, Detlef

PY - 2017/8/31

Y1 - 2017/8/31

M3 - Abstract

ER -