Construction Delay and Disruption Claims Assisted Through BIM Technology

Research output: Contribution to conferencePaper

Abstract

Construction projects are frequently subjected to delay and disruption leading to dispute between project participants regarding the entitlement to compensation. Challenges associated with the analysis of delay and disruption and the subsequent preparation of the claim conducted by a forensic analysis expert include the difficult retrieval of scattered, unstructured information and lack of adequate documentation, leading to weak analysis and therefore insufficient proof of causation and entitlement.This paper illustrates the chronological information generation regarding delay and disruption in the construction phase proposing a framework based on Building Information Modelling and structured information integration, to facilitate easy filing and retrieval of relevant documentation for claim preparation.
Original languageEnglish
Publication statusPublished - 4 Jul 2017
EventLean and Computing in Construction Congress (LC³): The Joint Conference on Computing in Construction (JC³) - Aldemar Knossos Royal Village Hotel, Heraklion, Crete, Greece
Duration: 4 Jul 20177 Jul 2017
http://www.lc3-2017.com/

Conference

ConferenceLean and Computing in Construction Congress (LC³)
Abbreviated titleLC3
CountryGreece
CityHeraklion, Crete
Period4/07/177/07/17
Internet address

Keywords

  • delay and disruption claims
  • documentation
  • forensic analysis
  • BIM
  • BCF

Fingerprint Dive into the research topics of 'Construction Delay and Disruption Claims Assisted Through BIM Technology'. Together they form a unique fingerprint.

Cite this