Conformity investigation of type 3 doubly fed induction generator wind power plant regarding grid code compliance test

Research output: Contribution to conferencePaperpeer-review

Abstract

According to the currently valid technical and organizational rules for operators and users of grids, in short TOR Erzeuger among others, a proof of conformity of fault ride through capability, in short FRT capability, must be provided by means of simulation. This paper analyzes the different methods by which this can be done, how the methods affect the results, and which parameter sets, specified with uncertainty by the grid operator, affect the behavior of the power generation system.
Translated title of the contributionKonformitätsuntersuchung eines Typ 3 doppelt gespeisten Generators einer Windkraftanlage gemäß den Netzanschlussbedingungen
Original languageEnglish
Publication statusSubmitted - 2022
Event2022 IEEE Power and Energy Student Summit and Power Electronics Student Summit: PESS & PELSS 2022 - Kassel, Germany
Duration: 2 Nov 20224 Nov 2022
https://www.uni-kassel.de/eecs/e2n/pess-pelss-2022

Conference

Conference2022 IEEE Power and Energy Student Summit and Power Electronics Student Summit
Abbreviated titlePESS & PELSS 2022
Country/TerritoryGermany
CityKassel
Period2/11/224/11/22
Internet address

ASJC Scopus subject areas

  • Electrical and Electronic Engineering

Fields of Expertise

  • Sustainable Systems

Cite this