CONFORMITY INVESTIGATION OF SMALL HYDROPOWER PLANTS REGARDING GRID CODE COMPLIANCE TEST

Research output: Contribution to conferencePaperpeer-review

Abstract

The verification of the fault ride through capability, FRT for short, in Austria is required by the TOR-Erzeuger guidelines through a simulation. For the verification of the FRT capability it is necessary to generate voltage dips and to assess the stability based on the dynamic behavior of the power generation plant. This paper deals with the influence of different simulation methods for the generation of a voltage dip and their effect on the stability of a hydro generator.
Translated title of the contributionKonformitätsüberprüfung von kleinen Wassergeneratoren gemäß den Netzanschlussbedingungen
Original languageEnglish
Publication statusAccepted/In press - 2022
Event21st International Seminar on Hydropower Plants: ViennaHydro 2022 - Wien, Austria
Duration: 9 Nov 202211 Nov 2022
https://www.viennahydro.com/

Conference

Conference21st International Seminar on Hydropower Plants
Abbreviated titleViennaHydro 2022
Country/TerritoryAustria
CityWien
Period9/11/2211/11/22