Calculation of Construction Time for Building Projects – Application of the Monte Carlo Method to Determine the Period Required for Shell Construction Works

Research output: Chapter in Book/Report/Conference proceedingConference contributionResearchpeer-review

Original languageEnglish
Title of host publicationCIB 2010 World Congress
Publisher.
Pages1-12
ISBN (Print)978-1-905732-91-3
Publication statusPublished - 2010
EventCIB World Congress - Brisbane, Australia
Duration: 5 May 20139 May 2013

Conference

ConferenceCIB World Congress
CountryAustralia
CityBrisbane
Period5/05/139/05/13

Treatment code (Nähere Zuordnung)

  • Application
  • Theoretical

Cite this

Calculation of Construction Time for Building Projects – Application of the Monte Carlo Method to Determine the Period Required for Shell Construction Works. / Hofstadler, Christian.

CIB 2010 World Congress. ., 2010. p. 1-12.

Research output: Chapter in Book/Report/Conference proceedingConference contributionResearchpeer-review

@inproceedings{4629592db5494127b3c07796659d7511,
title = "Calculation of Construction Time for Building Projects – Application of the Monte Carlo Method to Determine the Period Required for Shell Construction Works",
author = "Christian Hofstadler",
year = "2010",
language = "English",
isbn = "978-1-905732-91-3",
pages = "1--12",
booktitle = "CIB 2010 World Congress",
publisher = ".",

}

TY - GEN

T1 - Calculation of Construction Time for Building Projects – Application of the Monte Carlo Method to Determine the Period Required for Shell Construction Works

AU - Hofstadler, Christian

PY - 2010

Y1 - 2010

UR - http://www.cib2010.org/post

UR - http://www.cib2010.org/post/files/papers/551.pdf

M3 - Conference contribution

SN - 978-1-905732-91-3

SP - 1

EP - 12

BT - CIB 2010 World Congress

PB - .

ER -