Application of the Monte-Carlo method to determine the time required for construction projects – Influence of ranges and correlations on probability distribution

Research output: Chapter in Book/Report/Conference proceedingConference contributionResearchpeer-review

Original languageEnglish
Title of host publicationInternational Conference on Applications of Statistics and Probability in Civil Engineering
Place of PublicationLeiden
PublisherHolland
Pages48-55
Publication statusPublished - 2011
EventInternational Conference on Applications of Statistics and Probability in Civil Engineering - Zürich, Switzerland
Duration: 2 Aug 20114 Aug 2011

Conference

ConferenceInternational Conference on Applications of Statistics and Probability in Civil Engineering
CountrySwitzerland
CityZürich
Period2/08/114/08/11

Fields of Expertise

  • Sonstiges

Cite this

Hofstadler, C. (2011). Application of the Monte-Carlo method to determine the time required for construction projects – Influence of ranges and correlations on probability distribution. In International Conference on Applications of Statistics and Probability in Civil Engineering (pp. 48-55). Leiden: Holland.

Application of the Monte-Carlo method to determine the time required for construction projects – Influence of ranges and correlations on probability distribution. / Hofstadler, Christian.

International Conference on Applications of Statistics and Probability in Civil Engineering. Leiden : Holland, 2011. p. 48-55.

Research output: Chapter in Book/Report/Conference proceedingConference contributionResearchpeer-review

Hofstadler, C 2011, Application of the Monte-Carlo method to determine the time required for construction projects – Influence of ranges and correlations on probability distribution. in International Conference on Applications of Statistics and Probability in Civil Engineering. Holland, Leiden, pp. 48-55, International Conference on Applications of Statistics and Probability in Civil Engineering, Zürich, Switzerland, 2/08/11.
Hofstadler C. Application of the Monte-Carlo method to determine the time required for construction projects – Influence of ranges and correlations on probability distribution. In International Conference on Applications of Statistics and Probability in Civil Engineering. Leiden: Holland. 2011. p. 48-55
Hofstadler, Christian. / Application of the Monte-Carlo method to determine the time required for construction projects – Influence of ranges and correlations on probability distribution. International Conference on Applications of Statistics and Probability in Civil Engineering. Leiden : Holland, 2011. pp. 48-55
@inproceedings{6aee45f0b29c4753902d2824a27d9cd0,
title = "Application of the Monte-Carlo method to determine the time required for construction projects – Influence of ranges and correlations on probability distribution",
author = "Christian Hofstadler",
year = "2011",
language = "English",
pages = "48--55",
booktitle = "International Conference on Applications of Statistics and Probability in Civil Engineering",
publisher = "Holland",

}

TY - GEN

T1 - Application of the Monte-Carlo method to determine the time required for construction projects – Influence of ranges and correlations on probability distribution

AU - Hofstadler, Christian

PY - 2011

Y1 - 2011

UR - http://www.ibk.ethz.ch/fa/icasp11/

M3 - Conference contribution

SP - 48

EP - 55

BT - International Conference on Applications of Statistics and Probability in Civil Engineering

PB - Holland

CY - Leiden

ER -