Project Details
Description
Track work cost depend on length of work site and thus track possessions available, the longer the possession the lower the unit costs. However, cost of possession increase with increasing duration of track work. thus an optimal track possession can be calculated.
Status | Finished |
---|---|
Effective start/end date | 1/03/08 → 1/11/08 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.