Waste water treatment of a furfural production plant

  • Huber, Christian, (Co-Investigator (CoI))
  • Gamse, Thomas (Co-Investigator (CoI))
  • Marr, Rolf-Jürgen (Principal Investigator (PI))
  • Gangl, Wolfgang, (Co-Investigator (CoI))

Project: Research project

Description

The waste water of a furfural production plant had to be purified because of high acetic acid and furfural concentration.
Scientific programme resulted in the development of a pilot plant for cristallisation of sodium acetate.
StatusFinished
Effective start/end date1/02/0231/05/03