Project Details
Description
The objective of the present project, in addition to increasing the capacity of the line, the construction of additional stops and the creation of an attractive tangential connection for public transport, is to reduce the urban space barrier by eliminating railroad intersections. Furthermore, the aim is to reduce equipment that is no longer required and to optimize the equipment (reduction of gradient conditions).
Status | Finished |
---|---|
Effective start/end date | 23/05/17 → 23/12/19 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.