TGA Holzbau - Expansion of competence for planning and execution of technical building equipment in timber construction

Project: Research project

Project Details

Description

In the area of ​​the growing timber market, the adaptation of planning, execution is lagging behind and interface coordination of the building technology installation continues steadily developed wooden construction afterwards. In the qualification seminar TGA Holzbau, this topic will be taken from building physics, taken from a constructive and construction-economic perspective and viewed holistically Building technology solutions - which are tailored to the degree of prefabrication of timber construction - taught. In particular Lean Construction is used to optimize the TGA work processes received the installation work on the assembly speeds to adapt the timber construction. The participants gain in-depth knowledge of various aspects of the TGA installations in timber construction, based on current research results and construction progress analyzes. Here are both an increase in the quality and the profitability of TGA installation work in timber construction, through optimization and standardization of processes, the goal.
StatusFinished
Effective start/end date1/12/1931/05/20

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.