SBT1.1-GSA-CHECK - Scientific examination of the two wastewater treatment plants for the purification of tunnel wastewater during the construction of the Semmering Base Tunnel in the SBT1.1 construction section

Project: Research project

Description

Within the scope of the project, the two wastewater treatment plants for the purification of tunnel wastewater during the construction of the Semmering Base Tunnel in the SBT1.1 construction section are being scientifically investigated and their functionality and design examined.
StatusActive
Effective start/end date15/01/2031/12/20