Project Details
Description
The consultancy activities relate to the preparation phase for tender planning and include the specialist areas of earthing systems / earthing systems and equipotential bonding as well as a building protection zone concept and lightning protection for the new Pongau 380/220/110/30 kV substation according to the state of the art and technology applicable standards. For the protection concept of the building, operating frequency and transient events based on the specified high short-circuit power and duration are taken into account.
Due to the substation situation with voltage levels 380/220/110/30 kV with the respective high short-circuit power (63/50/40 kA per 1 second) as well as the surrounding infrastructures like Fahrtrasse, existing substation and main road, extensive calculations are required for the consulting activities to prepare for electrical interference.
Due to the substation situation with voltage levels 380/220/110/30 kV with the respective high short-circuit power (63/50/40 kA per 1 second) as well as the surrounding infrastructures like Fahrtrasse, existing substation and main road, extensive calculations are required for the consulting activities to prepare for electrical interference.
Status | Finished |
---|---|
Effective start/end date | 1/10/17 → 30/06/18 |