Optimisation of the Maintainance Strategy of the Water Network of the City of Linz

Project: Research project

Project Details

Description

On the basis of the GIS data about the network, the network break failures, the rehabilitation costs and the failure costs the used rehabilitation strategy of the city of linz should be optimised. Therefore the Modelling Tool PiReP is used to analyse break failure rates, to calibrate aging functions and to modelise the longterm rehabilitation needs. Various szenarios for future rehabilitation programs are compared. Furthermore priorities for rehabilitation are defined. Therefore technical, economic and specific regional criteria for rehabilitation are investigated. The result will be a list of rehabilitation priorities which can be visualized and used for further planning in the GIS
StatusFinished
Effective start/end date1/10/014/04/04

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.