MV Purbach - Model test Purbach

Project: Research project

Project Details

Description

Due to the construction of a new hydroelectric power plant in the centre of Judenburg, there will be an underwater deepening and profile lowering. About 700 m downstream of the new weir axis, the Purbach flows into the Mur. The planned deepening of the riverbed will therefore change the inlet situation in this area - the difference in height between the Purbach and Mur riverbeds will increase. The proposed design for the new Purbach / Mur estuary structure is to be investigated and optimised in a hydraulic model test. For the verification of the energy dissipation and erosion resistance in the river bed of the Mur, with different impacts from the Purbach, we are preparing a full model.
StatusFinished
Effective start/end date2/07/2031/07/21

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.