Project Details
Description
- systematic study for two bridge types (concrete plate bridges and WIB - structures) for specific high speed trains and the load models of the Eurocode
Status | Finished |
---|---|
Effective start/end date | 1/10/13 → 31/01/14 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.