Design of temporary steel railway bridges - HHB 291, HHB 239, HHB 213

Project: Research project

Description

- design of railway bridges, including high speed traffic (160 km/h)
- check of calculations, design drawings
- development of structural details and joints
StatusFinished
Effective start/end date1/09/1430/11/14