Design of temporary steel railway bridges - HHB 265

Project: Research project

Project Details

Description

- design of railway bridges, including high speed traffic (160 km/h)
- check of calculations, design drawings
- development of structural details and joints
StatusFinished
Effective start/end date1/10/1331/12/13

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.