Design of temporary steel railway bridges - HHB 187, HHB 161, HHB 135, HHB 109

Project: Research project

Project Details

Description

- design of railway bridges, including high speed traffic (160 km/h)
- check of calculations, design drawings
- development of structural details and joints
StatusFinished
Effective start/end date1/06/151/01/16