Project Details
Description
The city of Graz is readapting its sewage treatment plant to the actual state of the art (nutrient elimination). It is the task of the institute to assist and scientifically supervise this process. All aspects of planned process engineering, constructive and hydraulic design, machine and steering systems are being checked.
Status | Finished |
---|---|
Effective start/end date | 1/02/01 → 31/12/07 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.