Project Details
Description
For the existing bridge structure tension tests on specimen of the main girder (web and bottom flange) were done. The material strength parameter were analysed, compared with the assumptions of the original design calculations and the effects on the planned traffic configuration, four lanes on one bridge structure, were determined.
Status | Finished |
---|---|
Effective start/end date | 1/04/20 → 30/11/20 |