Search concepts
|
Selected filters
|
- 750 - 800 out of 7,339 results
- Export search results
Search results
-
-
BE2020_Flexibil - Model-based control for Technology Flexibilization
1/04/19 → 31/03/23
Project: Research project
-
BE2020_FlexiFuelConversion - Concpets for future fuel-flexible fixed-bed conversion technologies
1/04/19 → 31/03/23
Project: Research project
-
BE2020_Interaction - Interaction of Technologies and Systems
1/04/19 → 31/03/23
Project: Research project
-
-
BE2020_ModMan - Model-Based Management of Renewable Energy in Buildings
1/04/17 → 31/03/18
Project: Research project
-
-
Bearing Capacity of Retrofitted Bridge Decks
Fülöp, U., Linder, J., Freytag, B., Hartl, H. & Kernbichler, K.
1/06/01 → 31/01/02
Project: Research project
-
Beating of papermaking fibres
Stark, H., Eichinger, R. & Pregetter, M.
1/04/93 → 31/10/98
Project: Research project
-
Bechmarking Croatia - JADRAN - Benchmarking System and Project Monitoring for Coastal Utilities in Croatia
Fuchs-Hanusch, D., Theuretzbacher-Fritz, H. & Rohrhofer, K.
1/07/11 → 30/06/12
Project: Research project
-
-
-
Beeinflussung Gas - Analysis of interference of gas pipelines
17/12/18 → 30/04/19
Project: Research project
-
BEEVKOMP - Assessment of compost cattle barns with regard of compostquality, odour and Greenhousegasemissions
Pöllinger-Zierler, B.
1/06/15 → 31/05/16
Project: Research project
-
Befe++
Carvalho dos Prazeres, P. G., Thöni, K., Beer, G., Zechner, J., Dünser, C., Riederer, K. & Maues Brabo Pereira, A.
1/01/03 → 31/01/12
Project: Research area
-
Befliegung Deponie Grub - Koralmbahn Graz-Klagenfurt, contract section KAT2 section Deutschlandsberg - St. Andrä landfill Grub Befliegung Deponie Grub
26/11/14 → 30/06/15
Project: Research project
-
-
Begleitende Kontrolle - Verf. - Sewage Treatment Plant of Graz - Adaptation to the State of the Art - Process Engineering Supervision
1/02/01 → 31/12/07
Project: Research project
-
Begleitende Unterstützungsleistungen seitens der TU Graz im Projekt BA 137 - Hydraulische Sanierung Abwasserentsorgung Andritz
Friedl, F. & Fuchs-Hanusch, D.
1/01/11 → 31/12/12
Project: Research project
-
Begutachtung Aufwandswerte für Stützmittel
Reinisch, A., Stadler, G. & Einspieler, K.
1/01/00 → 31/01/00
Project: Research project
-
Behavior of Shear Forces between Prefabricated Concrete Elements and In Situ Concrete
1/01/95 → 31/01/00
Project: Research project
-
Behaviour of Ash-forming Compounds in Biomass Furnaces
Schmied, M. M., Pölt, P. & Reichmann, A.
1/01/00 → 31/12/02
Project: Research project
-
-
BEJOND - Stormwater management beyond design storms and planned operating conditions
1/09/20 → 28/02/23
Project: Research project
-
Bemessungsniederschl in d SWW - Design depth of precipitation in urban water management
Krall, E., Gruber, G. & Kainz, H.
1/07/04 → 28/02/06
Project: Research project
-
BEM for linear elasticity problems
Of, G., Urthaler, P. & Steinbach, O.
1/12/04 → …
Project: Research project
-
-
Benchmark calculation of four CFD codes on the example of an axial pump
Sadnik, D. & Schaffler, G. H.
1/11/97 → 30/06/98
Project: Research project
-
Benchmarking and Recommendations for Best Practice for Numerical Analysis in Geotechnical Engineering
1/01/04 → 31/12/05
Project: Research project
-
-
-
Benchmarking ÖVGW - Stufe B - Benchmarking and Best Practices in the Austrian Water Supply - Main Project "stage B"
Theuretzbacher-Fritz, H. & Kölbl, J.
1/07/04 → 30/06/06
Project: Research project
-
Berechnung der Auswirkung von Verkehrsmaßnahmen auf die NOx-Emissionen in Österreich
1/11/06 → 31/08/07
Project: Research project
-
Berechnung der Stromaufteilung in einem 80MVA Hochstromtransformator
1/09/07 → …
Project: Research project
-
-
-
-
-
Berechnung von Drehstrommotoren - FEM calucation of three-phase machines
1/10/07 → 11/07/08
Project: Research project
-
Berndorf - Berechnung Edelst - Tragfähigkeitsberechnung Edelstahlbecken (Berndorf)
Lechner, A.
4/11/09 → 31/12/10
Project: Research project
-
Best. thermophys. Daten von St. - Experimentelle Bestimmung thermophysikalischer Daten von Stählen und Nickelbasislegierungen
Wilthan, B. & Pottlacher, G.
1/01/06 → 30/06/07
Project: Research project
-
-
-
-
Best Practice Guide of Double Skin Facades
Heimrath, R., Mach, T. & Streicher, W.
1/01/05 → 31/12/08
Project: Research project
-
Best Practice Solutions regarding quality requirements for fusion welding of metallic materials based on ISO 3834 for welding companies (JOIN E.2)
9/10/07 → 31/12/09
Project: Research project
-
BETamp - Ballast evaluation as part of tamping measures
Landgraf, M. & Offenbacher, S.
1/01/19 → 31/03/19
Project: Research project
-
BET - BioEnergyTrain
Bauer, W., Narodoslawsky, M. & Hasewend, B.
1/06/15 → 31/05/19
Project: Research project
-
Betondach MaxBögl - Supporting Structures Made of Thin Concrete Elements - Design of a Shell-Like Concrete Roof in Precast Construction
Peters, S. & Parmann, G.
1/09/15 → …
Project: Research project