Projects 1992 2019

Active

Design of Pipe Roof Support System

Volkmann, G. & Schubert, W.

1/01/02 → …

Project: Research project

Rock Mass Characterisation and Modelling

Schubert, W.

1/01/00 → …

Project: Research area

Rock Mechanics Laboratory Testing

Schubert, W. & Blümel, M.

1/01/00 → …

Project: Research area

Prediction of Displacements in Tunnelling

Radoncic, N., Pilgerstorfer, T., Leber, C. & Schubert, W.

1/12/96 → …

Project: Research project

Modelling of Rock Mass Behaviour

Radoncic, N., Pilgerstorfer, T., Schubert, W. & Leber, C.

1/12/92 → …

Project: Research project

Tunnelling in poor and faulted Rock Mass

Volkmann, G., Lee, Y. & Schubert, W.

1/10/92 → …

Project: Research area

Geotechnical Monitoring

Grossauer, K. & Schubert, W.

1/10/92 → …

Project: Research area

Tunnelling in poor and faulted Rock Mass

Pötsch, M., Golser, H., Button, E. A., Moritz, A. B., Sellner, P. J., Pilgerstorfer, T. & Schubert, W.

1/10/92 → …

Project: Research project

Stability prediction for slopes and hillsides

Semprich, S., Schubert, W., Steger, G., Scharinger, F., Leibniz, O., Grossauer, K., Leitner, R., Lenzi, M. & Blümel, M.

1/02/0630/11/06

Project: Research project

Automatic Evaluation of Displacement Monitoring Data

Grossauer, K. & Schubert, W.

1/09/051/01/10

Project: Research project

EU - TUNConstruct - Technology Innovation in Underground Construction

Carvalho dos Prazeres, P. G., Lammerer, W., Riederer, K., Zechner, J., Beer, G., Grossauer, K., Schubert, W., Maues Brabo Pereira, A., Pilgerstorfer, T., Dünser, C., Kavelar, E. & Radoncic, N.

1/09/0531/08/09

Project: Research project

Risk Oriented Design Support System

Schubert, W.

1/09/051/01/10

Project: Research project

Determination of Round Length for Tunnels in Weak Rock

Lee, Y. & Schubert, W.

1/05/051/01/10

Project: Research project

Ground Behaviour Modes

Grossauer, K. & Schubert, W.

1/04/041/01/10

Project: Research project

Time Dependent Displacements in Tunnel Excavation

Schubert, W.

1/03/031/01/10

Project: Research project

Rock Mass Characterization of Phyllites for Tunnelling (II)

Button, E. A., Schubert, W. & Riedmüller, G.

1/01/0131/12/03

Project: Research project

Numerical Simulation in Tunnelling

Schubert, W., Schweiger, H., Beer, G., Golser, H., Riedmüller, G., Opriessnig, G., Gaich, A., Semprich, S., Schuller, H., Fasching, A. & Gruber, F. J.

1/05/9731/01/01

Project: Research project

Rock Mass Characterization of Phyllites for Tunneling

Schubert, W. & Riedmüller, G.

1/01/9631/01/97

Project: Research project