No photo of Michael Bacher

Michael Bacher

Dipl.-Ing. Dr.techn.

1975 …2019
If you made any changes in Pure these will be visible here soon.

Research Output 1998 2019

Filter
Paper
2017

Ventilation and safety concept of the emergency stop station ant the cross passages of the 33 km long Koralm rail tunnel

Bacher, M., Sturm, P-J., Fruhwirt, D., Rodler, J., Steiner, H. & Sampl, J., 13 Sep 2017, p. 559-574.

Research output: Contribution to conferencePaperResearchpeer-review

Ventilation
Rails
Tunnels
Smoke
incident
2011

Upgrading long traffic tunnels for fulfilling the EU requirements

Sturm, P-J., Bacher, M. & Schmölzer, G., 2011.

Research output: Contribution to conferencePaperResearch