Projects per year
Projects
- 15 Finished
Search results
-
Finished
Daimler 2 - RPM-Synchronous Noncircular Grinding
Ablinger, R. & Hochleitner, H.
10/02/11 → 28/06/13
Project: Research project
-
Development of Control Systems for Powershift and Powershuttle Gears
1/01/99 → 31/07/15
Project: Research project
-
-
Analysis of the Oil Contamination During the Line Up of Hydraulic Plants
1/01/99 → 31/07/15
Project: Research project
-
Analysis of the Wear Behaviour of Servo Valves within a Clear Water Hydraulic Plant and Development of Sealless and Leck Water Free Cylinders
1/01/99 → 31/07/15
Project: Research project
-
Field of Activity: Test Stands
Jürgens, G., Faber, F., Grünbaum, P. & Hochleitner, H.
1/01/98 → 31/07/15
Project: Research area
-
Optimization of an Aerostatic Slide Bearing for an Rotational Rheometer
Draxl, H. & Hochleitner, H.
1/01/98 → 31/07/15
Project: Research project
-
Planning, Construction and Implementing of an Oscillate Test Hall for the Testing of Large Components
1/01/97 → 31/07/15
Project: Research project
-
-
Examinations of Possibilities for Using Conventional Servo Valves in the Clean Water Hydraulics
1/01/95 → 31/07/15
Project: Research project
-
-
Working Area: Testing Technics
Grünbaum, P., Löffler, J., Hochleitner, H. & Faber, F.
1/01/95 → 31/07/15
Project: Research area
-
Development of Economical In-line Accumulators for the Clean Water Hydraulics
1/01/95 → 31/07/15
Project: Research project
-
Development of Temperature Compensated Valves for Vehicles
1/01/95 → 31/07/15
Project: Research project
-
Development of One-sided Working Cylinders without Seals for the Clean Water Hydraulics
1/01/95 → 31/07/15
Project: Research project