• 8010

    Lessingstraße 25 Graz

    Austria

Projects 1993 2019

Filter
Finished

"BRICO 2018" (Nordic Steel Bridge Competition)

Novak, F. & Kettler, M.

16/03/1831/03/19

Project: Research project

Design of crane runway girders for heavy duty cranes

Kettler, M.

1/12/171/12/18

Project: Research project

4. Grazer Stahlbautag - 4. Grazer Stahlbautag

Wiedner, S. & Unterweger, H.

1/07/1630/11/16

Project: Research project

Anchor of crane runway girders

Unterweger, H.

1/06/141/08/14

Project: Research project

Design of temporary steel railway bridges - HHB 265

Unterweger, H.

1/10/1331/12/13

Project: Research project

Design of a composite girder bridge

Unterweger, H.

1/09/131/11/13

Project: Research project

Design of a complex arch bridge

Unterweger, H.

1/01/1131/01/12

Project: Research project

Berndorf - Berechnung Edelst - Tragfähigkeitsberechnung Edelstahlbecken (Berndorf)

Lechner, A.

4/11/0931/12/10

Project: Research project

INJ09 - Innovation im Bau von Druckschatpanzerungen von Pumpspeicherwerken

Lechner, A. & Greiner, R.

17/08/0931/10/11

Project: Research project

Statik DPWH

Taras, A. & Greiner, R.

1/09/0730/09/07

Project: Research project

Calculation of joints in truss bridges

Taras, A. & Greiner, R.

1/08/0731/08/07

Project: Research project

VASD Wasserkonzept 20k

Ofner, R. & Greiner, R.

1/04/0731/12/07

Project: Research project

Investigation of failure-effects of the bridge-structure L40

Saurug, S., Lechner, A., Ofner, R. & Greiner, R.

1/03/0731/12/07

Project: Research project

Kopswerk II, Sonderuntersuchungen

Ofner, R., Saurug, S. & Greiner, R.

1/12/0630/06/07

Project: Research project

Eurosteel-Conference 2008 - Eurosteel-Conference 2008

Saurug, S., Unterweger, H., Taras, A., Kettler, M., Lechner, A., Ofner, R. & Greiner, R.

10/06/0531/10/08