• 8010

    Lessingstraße 25 Graz

    Austria

Projects 1993 2019

Experimental Research on steel structures

Taras, A., Unterweger, H. & Freytag, B.

1/10/04 → …

Project: Research area

pressure pipes and tank construction

1/01/97 → …

Project: Research area

construction stability

1/01/97 → …

Project: Research area

steel constructural engineering

1/01/97 → …

Project: Research area

steel and composite bridge

1/01/97 → …

Project: Research area

"BRICO 2018" (Nordic Steel Bridge Competition)

Novak, F. & Kettler, M.

16/03/1831/03/19

Project: Research project

Design of crane runway girders for heavy duty cranes

Kettler, M.

1/12/171/12/18

Project: Research project

4. Grazer Stahlbautag - 4. Grazer Stahlbautag

Wiedner, S. & Unterweger, H.

1/07/1630/11/16

Project: Research project

Anchor of crane runway girders

Unterweger, H.

1/06/141/08/14

Project: Research project

Design of temporary steel railway bridges - HHB 265

Unterweger, H.

1/10/1331/12/13

Project: Research project

Design of a composite girder bridge

Unterweger, H.

1/09/131/11/13

Project: Research project

Design of a complex arch bridge

Unterweger, H.

1/01/1131/01/12

Project: Research project

Berndorf - Berechnung Edelst - Tragfähigkeitsberechnung Edelstahlbecken (Berndorf)

Lechner, A.

4/11/0931/12/10

Project: Research project

INJ09 - Innovation im Bau von Druckschatpanzerungen von Pumpspeicherwerken

Lechner, A. & Greiner, R.

17/08/0931/10/11

Project: Research project

Statik DPWH

Taras, A. & Greiner, R.

1/09/0730/09/07

Project: Research project

Calculation of joints in truss bridges

Taras, A. & Greiner, R.

1/08/0731/08/07

Project: Research project