• 8010

    Rechbauerstraße 12 Graz

    Austria

Projects 1992 2020

Filter
Finished
Finished

SAQREAST - Stability analysis of the quarry Rabenwald, quarry face east

Buyer, A. A.

18/07/1831/01/19

Project: Research project

Stability prediction for slopes and hillsides

Semprich, S., Schubert, W., Steger, G., Scharinger, F., Leibniz, O., Grossauer, K., Leitner, R., Lenzi, M. & Blümel, M.

1/02/0630/11/06

Project: Research project

Risk Oriented Design Support System

Schubert, W.

1/09/051/01/10

Project: Research project

Automatic Evaluation of Displacement Monitoring Data

Grossauer, K. & Schubert, W.

1/09/051/01/10

Project: Research project

EU - TUNConstruct - Technology Innovation in Underground Construction

Carvalho dos Prazeres, P. G., Lammerer, W., Riederer, K., Zechner, J., Beer, G., Grossauer, K., Schubert, W., Maues Brabo Pereira, A., Pilgerstorfer, T., Dünser, C., Kavelar, E. & Radoncic, N.

1/09/0531/08/09

Project: Research project

Determination of Round Length for Tunnels in Weak Rock

Lee, Y. & Schubert, W.

1/05/051/01/10

Project: Research project

Ground Behaviour Modes

Grossauer, K. & Schubert, W.

1/04/041/01/10

Project: Research project

Time Dependent Displacements in Tunnel Excavation

Schubert, W.

1/03/031/01/10

Project: Research project

Rock Mass Characterization of Phyllites for Tunnelling (II)

Button, E. A., Schubert, W. & Riedmüller, G.

1/01/0131/12/03

Project: Research project

Risk Assessment

1/01/001/01/10

Project: Research area

Numerical Simulation in Tunnelling

Schubert, W., Schweiger, H., Beer, G., Golser, H., Riedmüller, G., Opriessnig, G., Gaich, A., Semprich, S., Schuller, H., Fasching, A. & Gruber, F. J.

1/05/9731/01/01

Project: Research project

Rock Mass Characterization of Phyllites for Tunneling

Schubert, W. & Riedmüller, G.

1/01/9631/01/97

Project: Research project