Institute of Construction Management and Economics (2180)

  • 8010

    Lessingstraße 25 Graz

    Austria

Research Output 1995 2019

Filter
Paper
2018

A Graphical User Interface (GUI) For Forensic Analysis Of Delay and Disruption

Valavanoglou, A., Heck, D. & Rebolj, D., 4 Dec 2018.

Research output: Contribution to conferencePaperResearchpeer-review

Graphical user interfaces
Demonstrations
Costs

Building information modeling in timber construction - A solution for planning process, design phases and the unification of scope of works

Aberger, E., Koppelhuber, J. & Heck, D., 22 Aug 2018.

Research output: Contribution to conferencePaperResearchpeer-review

planning process
timber
planning
modeling
timber industry

Business Model Development for Modular Timber Building Systems

Koppelhuber, J., Heck, D. & Wall, J., 4 Jul 2018. 9 p.

Research output: Contribution to conferencePaperResearchpeer-review

Die Bedeutung des Planungsprozesses für die Energieeffizienz von Gebäuden

Wall, J. & Hofstadler, C., 2018. 11 p.

Research output: Contribution to conferencePaperResearchpeer-review

Open Access

Portfolio Management in the Construction Industry – Pricing Strategies Considering the Chance/Risk Ratio for Several Projects

Kummer, M. & Hofstadler, C., Jul 2018, p. 22-29. 8 p.

Research output: Contribution to conferencePaperResearchpeer-review

Quantity Uncertainties in Shuttering Works – Comparison of Public versus Private Clients

Kummer, M., Jul 2018, p. 178-186. 9 p.

Research output: Contribution to conferencePaperResearchpeer-review

The Dilemma of Pricing Against the Backdrop of the Chance/Risk Ratio

Hofstadler, C. & Kummer, M., Jul 2018, p. 220-229. 10 p.

Research output: Contribution to conferencePaperResearchpeer-review

UNIFIED TIMBER CONNECTIONS (UTC) – CONSTRUCTION MANAGEMENT ASPECTS WITHIN THE STANDARDISATION OF CONNECTION SYSTEMS IN TIMBER CONSTRUCTION

Koppelhuber, J., Heck, D. & Huter, P., 22 Aug 2018.

Research output: Contribution to conferencePaperResearchpeer-review

2017

Construction Delay and Disruption Claims Assisted Through BIM Technology

Valavanoglou, A., 4 Jul 2017.

Research output: Contribution to conferencePaperResearchpeer-review

Compensation and Redress

Using Supply Chain Management for Sustainable Public Procurement

Wall, J., Koppelhuber, J. & Hofstadler, C., 2017, p. 579-584.

Research output: Contribution to conferencePaperResearchpeer-review

Open Access
2016

BUILDING INFORMATION MODELLING AND FORENSIC ANALYSIS OF DELAY AND DISRUPTION

Valavanoglou, A. & Heck, D., 24 May 2016.

Research output: Contribution to conferencePaperResearch

Visualization
Compensation and Redress

CALCULATIVE COST AND PROCESS ANALYSIS OF TIMBERCONCRETE- COMPOSITE CEILINGS WITH FOCUS ON EFFORT AND PERFORMANCE VALUES FOR COST CALCULATIONS OF MULTISTOREY TIMBER BUILDINGS

Koppelhuber, J., Leitenbauer, A. G. & Heck, D., 23 Aug 2016.

Research output: Contribution to conferencePaperResearchpeer-review

Challenges in adapting tunnel construction contracts to actual ground conditions

Paar, L., Apr 2016.

Research output: Contribution to conferencePaperResearchpeer-review

Industrialized Timber Building Systems For An Increased Market Share – A Holistic Approach Targeting Construction Management And Building Economics

Koppelhuber, J., Bauer, B. & Heck, D., 5 Sep 2016.

Research output: Contribution to conferencePaperResearchpeer-review

INDUSTRIALIZED TIMBER CONSTRUCTION – CONSTRUCTION MANAGEMENT ASPECTS AND INFLUENCES IN MODULAR TIMBER BUILDING SYSTEMS

Koppelhuber, J., Hintersteininger, K. & Heck, D., 24 May 2016.

Research output: Contribution to conferencePaperResearchpeer-review

2015

Construction management of multi-storey residential timber buildings – assessment criteria’s and their impact in the cost calculation

Koppelhuber, J., Zügner, D. & Heck, D., 24 Sep 2015.

Research output: Contribution to conferencePaperResearchpeer-review

COST CALCULATION IN PREFABRICATED TIMBER CONSTRUCTION – PROCESS ANALYSIS ON SITE AND APPLICABILITY FOR FUTURE PROJECTS

Koppelhuber, J., Schlagbauer, D. & Heck, D., 24 Nov 2015.

Research output: Contribution to conferencePaperResearchpeer-review