Calculation of Construction Time for Building Projects – Application of the Monte Carlo Method to Determine the Period Required for Shell Construction Works

Hofstadler, C. (Speaker)

Activity: Talk or presentationTalk at conference or symposiumScience to science

Period10 May 2010 - 13 May 2010
Held atCIB 2010 World Congress
Event typeConference