Application of the Monte-Carlo method to determine the time required for construction projects – Influence of ranges and correlations on probability distribution

Hofstadler, C. (Speaker)

Activity: Talk or presentationTalk at conference or symposiumScience to science

Period2 Aug 2011 - 4 Aug 2011
Held atInternational Conference on Applications of Statistics and Probability in Civil Engineering
Event typeConference
LocationZürich, Switzerland