Numerical analysis of the operation parameters of fast cycling superconducting magnets

Egbert Fischer, Pierre Schnizer, Roman Kurnyshov, Bernhard Schnizer, Petr A. Shcherbakov

Publikation: Beitrag in einer FachzeitschriftArtikelBegutachtung

Abstract

The 100 Tm heavy ion synchrotron SIS 100 is the core component of the Facility of Antiproton and Ion Research (FAIR). Prototype magnets were built last year with the first full scale dipole magnet completed and tested. Thorough R&D resulted in FEM models which allow calculating the magnetic field of the magnet during static and dynamic mode. We illustrate the R&D steps required for the FEM calculation. We illustrate its accuracy and describe the expected field quality and dissipated power.
Originalspracheenglisch
Seiten (von - bis)1266-1269
FachzeitschriftIEEE Transactions on Applied Superconductivity
Jahrgang19
Ausgabenummer3
DOIs
PublikationsstatusVeröffentlicht - 2009

Fields of Expertise

  • Sonstiges

Treatment code (Nähere Zuordnung)

  • Application
  • Theoretical
  • Experimental

Fingerprint

Untersuchen Sie die Forschungsthemen von „Numerical analysis of the operation parameters of fast cycling superconducting magnets“. Zusammen bilden sie einen einzigartigen Fingerprint.

Dieses zitieren