Climate change, renewable integration and abundant unconventional gas resources have boosted the utilization of gas for electricity generation. Generation companies with gas-fired power plants submit their hourly offers to organized electricity markets and make use of gas system infrastructure by nominating their planned utilized capacity on a daily basis. A MPEC problem has been developed to considering the temporal mismatch effects. Results are compared with the single level model.