INCREASING POWER OUTPUT AND FLEXIBILITY OF KOPS I HIGH HEAD POWER PLANT WITH THE HELP OF WATERHAMMER SIMULATIONS

Publikation: Beitrag in Buch/Bericht/KonferenzbandBeitrag in einem KonferenzbandForschungBegutachtung

Abstract

With highly volatile loads in electric grids from renewables like wind and solar grid service tasks become more and more important. A chance to increase the annual turnover of a storage hydro power plant is found not only in increasing the power output but also the availability and flexibility of an existing power plant. With the help of modern techniques in waterhammer simulations in combination with sophisticated numerical models for complex hydro power plant components an increase of power output and flexibility at the same time could be identified.
Originalspracheenglisch
Titel20. Internationales Seminar Wasserkraftanlagen
Untertitel40 Jahre Engagement zwischen Industrie und Wissenschaft - eine Erfolgsgeschichte
Herausgeber (Verlag)Technische Universität Wien
Seiten599-609
Seitenumfang11
ISBN (Print)978-3-9504338-1-4
PublikationsstatusVeröffentlicht - 16 Nov 2018
Veranstaltung20. Internationales Seminar Wasserkraftanlagen - Wien, Österreich
Dauer: 14 Nov 201816 Nov 2018

Konferenz

Konferenz20. Internationales Seminar Wasserkraftanlagen
KurztitelVienna Hydro 2018
LandÖsterreich
OrtWien
Zeitraum14/11/1816/11/18

Fingerprint

Power plants
Numerical models
Availability

Fields of Expertise

  • Sustainable Systems

Treatment code (Nähere Zuordnung)

  • Experimental
  • Application
  • Theoretical

Dies zitieren

Höller-Litzlhammer, S., Jaberg, H., & Wittwer, B. (2018). INCREASING POWER OUTPUT AND FLEXIBILITY OF KOPS I HIGH HEAD POWER PLANT WITH THE HELP OF WATERHAMMER SIMULATIONS. in 20. Internationales Seminar Wasserkraftanlagen: 40 Jahre Engagement zwischen Industrie und Wissenschaft - eine Erfolgsgeschichte (S. 599-609). Technische Universität Wien.

INCREASING POWER OUTPUT AND FLEXIBILITY OF KOPS I HIGH HEAD POWER PLANT WITH THE HELP OF WATERHAMMER SIMULATIONS. / Höller-Litzlhammer, Stefan; Jaberg, Helmut; Wittwer, Bernhard.

20. Internationales Seminar Wasserkraftanlagen: 40 Jahre Engagement zwischen Industrie und Wissenschaft - eine Erfolgsgeschichte. Technische Universität Wien, 2018. S. 599-609.

Publikation: Beitrag in Buch/Bericht/KonferenzbandBeitrag in einem KonferenzbandForschungBegutachtung

Höller-Litzlhammer, S, Jaberg, H & Wittwer, B 2018, INCREASING POWER OUTPUT AND FLEXIBILITY OF KOPS I HIGH HEAD POWER PLANT WITH THE HELP OF WATERHAMMER SIMULATIONS. in 20. Internationales Seminar Wasserkraftanlagen: 40 Jahre Engagement zwischen Industrie und Wissenschaft - eine Erfolgsgeschichte. Technische Universität Wien, S. 599-609, Wien, Österreich, 14/11/18.
Höller-Litzlhammer S, Jaberg H, Wittwer B. INCREASING POWER OUTPUT AND FLEXIBILITY OF KOPS I HIGH HEAD POWER PLANT WITH THE HELP OF WATERHAMMER SIMULATIONS. in 20. Internationales Seminar Wasserkraftanlagen: 40 Jahre Engagement zwischen Industrie und Wissenschaft - eine Erfolgsgeschichte. Technische Universität Wien. 2018. S. 599-609
Höller-Litzlhammer, Stefan ; Jaberg, Helmut ; Wittwer, Bernhard. / INCREASING POWER OUTPUT AND FLEXIBILITY OF KOPS I HIGH HEAD POWER PLANT WITH THE HELP OF WATERHAMMER SIMULATIONS. 20. Internationales Seminar Wasserkraftanlagen: 40 Jahre Engagement zwischen Industrie und Wissenschaft - eine Erfolgsgeschichte. Technische Universität Wien, 2018. S. 599-609
@inproceedings{85bba20de3174f3085c58f4830f30950,
title = "INCREASING POWER OUTPUT AND FLEXIBILITY OF KOPS I HIGH HEAD POWER PLANT WITH THE HELP OF WATERHAMMER SIMULATIONS",
abstract = "With highly volatile loads in electric grids from renewables like wind and solar grid service tasks become more and more important. A chance to increase the annual turnover of a storage hydro power plant is found not only in increasing the power output but also the availability and flexibility of an existing power plant. With the help of modern techniques in waterhammer simulations in combination with sophisticated numerical models for complex hydro power plant components an increase of power output and flexibility at the same time could be identified.",
author = "Stefan H{\"o}ller-Litzlhammer and Helmut Jaberg and Bernhard Wittwer",
year = "2018",
month = "11",
day = "16",
language = "English",
isbn = "978-3-9504338-1-4",
pages = "599--609",
booktitle = "20. Internationales Seminar Wasserkraftanlagen",
publisher = "Technische Universit{\"a}t Wien",
address = "Austria",

}

TY - GEN

T1 - INCREASING POWER OUTPUT AND FLEXIBILITY OF KOPS I HIGH HEAD POWER PLANT WITH THE HELP OF WATERHAMMER SIMULATIONS

AU - Höller-Litzlhammer, Stefan

AU - Jaberg, Helmut

AU - Wittwer, Bernhard

PY - 2018/11/16

Y1 - 2018/11/16

N2 - With highly volatile loads in electric grids from renewables like wind and solar grid service tasks become more and more important. A chance to increase the annual turnover of a storage hydro power plant is found not only in increasing the power output but also the availability and flexibility of an existing power plant. With the help of modern techniques in waterhammer simulations in combination with sophisticated numerical models for complex hydro power plant components an increase of power output and flexibility at the same time could be identified.

AB - With highly volatile loads in electric grids from renewables like wind and solar grid service tasks become more and more important. A chance to increase the annual turnover of a storage hydro power plant is found not only in increasing the power output but also the availability and flexibility of an existing power plant. With the help of modern techniques in waterhammer simulations in combination with sophisticated numerical models for complex hydro power plant components an increase of power output and flexibility at the same time could be identified.

M3 - Conference contribution

SN - 978-3-9504338-1-4

SP - 599

EP - 609

BT - 20. Internationales Seminar Wasserkraftanlagen

PB - Technische Universität Wien

ER -