Abstract
Expected geological situation enforces to change the position of a valve cavern during construction of a pressure tunnel. With the help of the finite element method a predesign of permanent support is carried out. During construction stage a different geological situation leads to unforecasted displacements. However, a certain change of the model input parameter confirms measured data and the designed permanent support.
Titel in Übersetzung | Contribution for designing caverns with high overburden |
---|---|
Originalsprache | deutsch |
Seiten | 1251-1254 |
Seitenumfang | 4 |
Publikationsstatus | Veröffentlicht - 1991 |
Extern publiziert | Ja |
Veranstaltung | 7th International Society for Rock Mechanics and Rock Engineering Congress 1991 - Aachen, Deutschland Dauer: 16 Sept. 1991 → 20 Sept. 1991 |
Konferenz
Konferenz | 7th International Society for Rock Mechanics and Rock Engineering Congress 1991 |
---|---|
Land/Gebiet | Deutschland |
Ort | Aachen |
Zeitraum | 16/09/91 → 20/09/91 |
ASJC Scopus subject areas
- Geotechnik und Ingenieurgeologie
- Geologie