Construction Delay and Disruption Claims Assisted Through BIM Technology

Publikation: KonferenzbeitragPaper

Abstract

Construction projects are frequently subjected to delay and disruption leading to dispute between project participants regarding the entitlement to compensation. Challenges associated with the analysis of delay and disruption and the subsequent preparation of the claim conducted by a forensic analysis expert include the difficult retrieval of scattered, unstructured information and lack of adequate documentation, leading to weak analysis and therefore insufficient proof of causation and entitlement.This paper illustrates the chronological information generation regarding delay and disruption in the construction phase proposing a framework based on Building Information Modelling and structured information integration, to facilitate easy filing and retrieval of relevant documentation for claim preparation.
Originalspracheenglisch
PublikationsstatusVeröffentlicht - 4 Jul 2017
VeranstaltungLean and Computing in Construction Congress (LC³): The Joint Conference on Computing in Construction (JC³) - Aldemar Knossos Royal Village Hotel, Heraklion, Crete, Griechenland
Dauer: 4 Jul 20177 Jul 2017
http://www.lc3-2017.com/

Konferenz

KonferenzLean and Computing in Construction Congress (LC³)
KurztitelLC3
LandGriechenland
OrtHeraklion, Crete
Zeitraum4/07/177/07/17
Internetadresse

Fingerprint Untersuchen Sie die Forschungsthemen von „Construction Delay and Disruption Claims Assisted Through BIM Technology“. Zusammen bilden sie einen einzigartigen Fingerprint.

  • Dieses zitieren

    Valavanoglou, A. (2017). Construction Delay and Disruption Claims Assisted Through BIM Technology. Beitrag in Lean and Computing in Construction Congress (LC³), Heraklion, Crete, Griechenland.