Abstract
According to the currently valid technical and organizational rules for operators and users of grids, in short TOR Erzeuger among others, a proof of conformity of fault ride through capability, in short FRT capability, must be provided by means of simulation. This paper analyzes the different methods by which this can be done, how the methods affect the results, and which parameter sets, specified with uncertainty by the grid operator, affect the behavior of the power generation system.
Titel in Übersetzung | Konformitätsuntersuchung eines Typ 3 doppelt gespeisten Generators einer Windkraftanlage gemäß den Netzanschlussbedingungen |
---|---|
Originalsprache | englisch |
Titel | PESS + PELSS 2022; Power and Energy Student Summit |
Seiten | 67-71 |
Publikationsstatus | Veröffentlicht - 19 Apr. 2023 |
Veranstaltung | IEEE Power and Energy Student Summit 2022 and Power Electronics Student Summit: PESS & PELSS 2022 - Kassel, Deutschland Dauer: 2 Nov. 2022 → 4 Nov. 2022 https://www.uni-kassel.de/eecs/e2n/pess-pelss-2022 |
Konferenz
Konferenz | IEEE Power and Energy Student Summit 2022 and Power Electronics Student Summit |
---|---|
Kurztitel | PESS and PELSS 2022 |
Land/Gebiet | Deutschland |
Ort | Kassel |
Zeitraum | 2/11/22 → 4/11/22 |
Internetadresse |
Schlagwörter
- Fault Ride Through
- Grid code
- Compliance simulation
- Requirements for Generators
- TOR Erzeuger guideline
- RKS-AT
- DFIG
ASJC Scopus subject areas
- Elektrotechnik und Elektronik
Fields of Expertise
- Sustainable Systems