Calculation of "normal"construction time for building construction projects whilst considering uncertainties

Christian Hofstadler*

*Korrespondierende/r Autor/-in für diese Arbeit

Publikation: Beitrag in Buch/Bericht/KonferenzbandBeitrag in einem KonferenzbandBegutachtung

Abstract

Construction time has a major influence both on the cost-efficient execution of construction works and on the overall project outcome achieved by the client. Clients would do themselves a disservice if they specified short or extremely short construction periods for their projects. The same applies to time made available for project preparation, particularly for the design and tender stages. Any project that is poorly planned, tendered, and executed under time pressure will adversely affect actual construction work but also the building's use and possible reuse. Cost, time and quality targets are at risk due to the resulting disruptions to the construction process. Productivity is adversely affected not only by unduly short but also exceedingly long construction times. Short or very short construction times have a major influence on the efficient and effective utilization of production factors, including elementary (workforce, materials, equipment and machinery) and discretionary factors (project manager, site manager, technicians, etc.). This paper outlines the basic correlation between construction time, labor consumption rates and productivity as well as construction cost. Furthermore, it sets out to determine the influence of construction time on costing and, consequently, on the construction process. A practical example demonstrates how normal construction time can be calculated for reinforced concrete works based on uncertain input parameters. In addition, the benefits of specifying normal construction time for clients and contractors are outlined.

Originalspracheenglisch
TitelISEC 2017 - 9th International Structural Engineering and Construction Conference
UntertitelResilient Structures and Sustainable Construction
Redakteure/-innenJose M. Adam, Eugenio Pellicer, Siamak Yazdani, Amarjit Singh, Victor Yepes
Herausgeber (Verlag)ISEC Press
ISBN (elektronisch)9780996043748
PublikationsstatusVeröffentlicht - 1 Jan. 2017
Veranstaltung9th International Structural Engineering and Construction Conference: Resilient Structures and Sustainable Construction, ISEC 2017 - Valencia, Spanien
Dauer: 24 Juli 201729 Juli 2017

Publikationsreihe

NameISEC 2017 - 9th International Structural Engineering and Construction Conference: Resilient Structures and Sustainable Construction

Konferenz

Konferenz9th International Structural Engineering and Construction Conference: Resilient Structures and Sustainable Construction, ISEC 2017
Land/GebietSpanien
OrtValencia
Zeitraum24/07/1729/07/17

ASJC Scopus subject areas

  • Tief- und Ingenieurbau
  • Bauwesen

Fingerprint

Untersuchen Sie die Forschungsthemen von „Calculation of "normal"construction time for building construction projects whilst considering uncertainties“. Zusammen bilden sie einen einzigartigen Fingerprint.

Dieses zitieren